MES go-live and shop-floor training
MES & ERP·11 min read

MES Go-Live: 90-Day Plan

FAT/SAT, data migration, operator training, and hypercare — seamless cutover.

Go-liveCutover

Days 0–30: Preparation

Master data cleanup, equipment BOM, recipe versions. Operator scenarios and integration tests in sandbox.

Days 31–60: Pilot line

One line on live MES; parallel run with ERP. Hypercare team on-site + remote 24/7 for the first two weeks.

Days 61–90: Rollout

Remaining lines cutover; KPIs: OEE visibility, 100% lot trace, planned downtime logging discipline. 30 days tuning post go-live.

Trusted by industry leaders

CO

ChemOrion

Petrochemicals

PL

PharmaLine

Pharma / GMP

SF

SteelForge EU

Metals

PX

PolymerX

Polymers

TE

TitanEnergy

Energy

BG

BioPharm Global

Biotech

FP

FlexPack TR

Packaging

GW

GreenWater Utilities

Water

CO

ChemOrion

Petrochemicals

PL

PharmaLine

Pharma / GMP

SF

SteelForge EU

Metals

PX

PolymerX

Polymers

TE

TitanEnergy

Energy

BG

BioPharm Global

Biotech

FP

FlexPack TR

Packaging

GW

GreenWater Utilities

Water