Industry Solutions
From petrochemicals to GMP pharma — ready packages, sector KPIs, and integration templates.
Industries
Tailored for chemistry and manufacturing
Ready data models, integration templates, and KPI packs per sector.
Ready solution packages
Starter Package
Single-line MES + edge gateway — rapid visibility and OEE.
- →Gunkel MES (1 line)
- →Gunkel Edge gateway
- →4-week hypercare
Chemistry Package
Process + Lab Bridge + Twin — reactor and lab on one platform.
- →Gunkel Process & Lab
- →Gunkel Twin PoC
- →APC tuning sandbox
Enterprise Package
All modules, multi-tenant, OT Shield, and dedicated TAM.
- →Full platform suite
- →Gunkel Shield + SOC bridge
- →90-day hypercare
Related technology modules
Process Automation
DCS/PLC, batch management, and reactor sequencing for chemical and food processes.
Manufacturing MES
OEE, downtime analytics, and operator terminals — line visibility in one pane.
Chemistry & LIMS Integration
Bridges linking lab results to recipes and release decisions.
Digital Twin Platform
Virtual commissioning, APC sandbox, and historian replay — cloud-edge simulation.
Industrial Data Platform
Historian, edge analytics, and secure APIs — OT/IT convergence.
OT Cybersecurity
IEC 62443, segmentation, and 24/7 anomaly monitoring.
Why Gunkel
A technology company approach
Not consulting — a licensable platform, measurable KPIs, and fast integration.
Product, not projects
Modular licensing — new lines or sites added in hours via configuration.
Edge-first architecture
Critical control and operator UI keep running through cloud outages.
API & integration speed
Standard REST/GraphQL and webhooks — ERP/LIMS integration in days, not months.
Security built-in
IEC 62443, audit trail, and tenant isolation by default.
FAQ
Frequently asked questions
Does the platform run on-premise or cloud?+
Both: edge nodes on-premise, central management hybrid or full SaaS. Chemical plants typically use edge + private cloud.
Integration time with existing DCS/PLC?+
PoC in 2–4 weeks via OPC-UA/MQTT gateway; full MES integration 8–16 weeks depending on plant size (demo estimates).
How does licensing work?+
Module + line/reactor count + tenant — volume discounts for multi-site holdings. WHMCS integration on the roadmap.
GMP and IEC 62443 compliance?+
Audit trail, e-sign, and zone/conduit design on-platform; certification completed with customer validation.
Demo and POC process?+
Technical intro within 48 hours, sandbox tenant and sample datasets — live plant connection in the POC phase.
Support and SLA options?+
Business hours, 24/7 critical, and dedicated TAM tiers — uptime SLA target 99.2% (demo).